Projects Updated 9/8/25
-
Install 220V electricity to elevator site
-
Clean out gutter drain on north side of WC
-
Replace exterior bulb Ed Bldg north side
-
Replace discolored ceiling tiles in the south of mezzanine hallway
-
Install LED strips in outdoor sign (some fabrication needed)
-
Install 3rd speaker under balcony
-
Ed bldg foyer, 2nd floor - repair floor
-
Remove & replace parking lot light in rear
-
Paint facia on east and north sides of Worship Center (includes lift rental)
-
Install gutters on east and north sides of Worship Center (this is a guess)
-
Pressure wash Worship Center brick (near roof)
-
Install bell tower speakers
-
Replace bulbs on Worship Center porch
-
Wire 2nd floor light to office switch
-
Paint roof access ladder black
-
Repair drain valve in baptistery
-
Repair wooden doors on front of Worship Center
-
Replace closer on north door of interior Worship Center
-
Install blank on telephone jack (1st floor children's area) & paint
-
Combine lights to one switch in 2nd floor rooms